|
|
|
|
| LEADER |
00820nam a2200217 i 4500 |
| 001 |
c000238337 |
| 003 |
CARM |
| 005 |
00000000000000.0 |
| 008 |
840302s1976 ne 0 eng d |
| 019 |
1 |
|
|a 774803
|5 LACONCORD2021
|
| 020 |
|
|
|a 044441522X
|
| 035 |
|
|
|a (OCoLC)2524907
|5 LACONCORD2021
|
| 082 |
0 |
4 |
|a 338.4/7/62
|
| 100 |
1 |
|
|a Rose, L. M.,
|d 1935-
|
| 245 |
1 |
0 |
|a Engineering investment decisions :
|b planning under uncertainty /
|c L. M. Rose.
|
| 260 |
|
|
|a Amsterdam :
|b Elsevier Scientific Pub. Co,
|c 1976.
|
| 300 |
|
|
|a xv, 477 p. :
|b ill. ;
|c 25 cm.
|
| 650 |
|
0 |
|a Engineering economy.
|
| 852 |
8 |
|
|b CARM
|h A1:AQ13E0
|i C09011
|p 0366255
|f BK
|
| 999 |
f |
f |
|i 66e23355-c811-53e0-8b24-34f7c83a11bd
|s 35433664-9d3a-5785-8e86-2cc2c035e68a
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e C09011
|f A1:AQ13E0
|h Other scheme
|i book
|m 0366255
|