|
|
|
|
| LEADER |
01444cam a2200301 a 4500 |
| 001 |
c000229091 |
| 003 |
CARM |
| 005 |
20070122162157.0 |
| 008 |
940308s1994 njua b 001 0 eng |
| 010 |
|
|
|a 94008916
|
| 019 |
1 |
|
|a 10842762
|5 LACONCORD2021
|
| 020 |
|
|
|a 0130727865
|
| 035 |
|
|
|a (OCoLC)30037006
|5 LACONCORD2021
|
| 040 |
|
|
|a TOC
|b eng
|c TOC
|d TOC
|
| 050 |
|
0 |
|a TS155.63
|b .O88 1994
|
| 082 |
0 |
0 |
|a 658.5
|2 20
|
| 100 |
1 |
|
|a O'Sullivan, David.
|
| 245 |
1 |
0 |
|a Manufacturing systems redesign :
|b creating the integrated manufacturing environment /
|c David O'Sullivan.
|
| 260 |
|
|
|a Englewood Cliffs, N.J. :
|b PTR Prentice Hall,
|c c1994.
|
| 300 |
|
|
|a xv, 204 p. :
|b ill. ;
|c 25 cm.
|
| 504 |
|
|
|a Includes bibliographical references (p. 192-198) and index.
|
| 505 |
0 |
|
|a Ch. 1. Manufacturing and Integration -- Ch. 2. Technical Planning Systems -- Ch. 3. Social and Systems Planning -- Ch. 4. Theory of Manufacturing Systems Design -- Ch. 5. Integrated Manufacturing Systems Design Road Map (IMP) -- Ch. 6. Integrated Manufacturing Systems Design.
|
| 650 |
|
0 |
|a Computer integrated manufacturing systems
|x Planning.
|
| 650 |
|
0 |
|a Production planning.
|
| 650 |
|
0 |
|a Flexible manufacturing systems
|x Planning.
|
| 852 |
8 |
|
|b CARM
|h A1:AP15C0
|i C08907
|p 0340616
|f BK
|
| 999 |
f |
f |
|i 686e195f-421f-5d74-ab10-997d7b38b3fc
|s 245c1679-40cf-5ffe-b987-2a5f8a0e2473
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e C08907
|f A1:AP15C0
|h Other scheme
|i book
|m 0340616
|