|
|
|
|
| LEADER |
01363cam a2200313 a 4500 |
| 001 |
c000223704 |
| 003 |
CARM |
| 005 |
20060925140559.0 |
| 008 |
950420s1994 xnaa b 000 0 eng d |
| 019 |
1 |
|
|a 11544103
|5 LACONCORD2021
|
| 020 |
|
|
|a 0725908246
|
| 035 |
|
|
|a (OCoLC)38380669
|5 LACONCORD2021
|
| 040 |
|
|
|a WU
|b eng
|c WU
|d ANL:NR
|
| 042 |
|
|
|a anuc
|
| 082 |
0 |
4 |
|a 551.488015118
|2 20
|
| 245 |
0 |
0 |
|a Calibration of DISTFW parameters for the QDPI rainfall simulator Tarong Mine /
|c M. Arkinstal ... [et al.].
|
| 260 |
|
|
|a Callaghan, N.S.W. :
|b Dept. of Civil Engineering and Surveying, University of Newcastle,
|c 1994.
|
| 300 |
|
|
|a 32 p. :
|b ill. ;
|c 21 cm.
|
| 490 |
1 |
|
|a Research report ;
|v no. 095.04.1994
|
| 504 |
|
|
|a Bibliography: p. 31-32.
|
| 650 |
|
0 |
|a Runoff
|x Mathematical models.
|
| 650 |
|
0 |
|a Rain and rainfall
|x Mathematical models.
|
| 650 |
|
0 |
|a Hydrologic models.
|
| 700 |
0 |
|
|a Arkinstal, M.
|
| 710 |
2 |
|
|a University of Newcastle (N.S.W.).
|b Dept. of Civil Engineering and Surveying.
|
| 830 |
|
0 |
|a Research report (University of Newcastle (N.S.W.). Dept. of Civil Engineering and Surveying) ;
|v no. 095.04.1994.
|
| 852 |
8 |
|
|b CARM
|h A2:AP05A0
|i B06620
|p 0314966
|f BK
|
| 999 |
f |
f |
|i 5f4c8080-dc16-5e07-b28e-76e3864c9da2
|s 4ea3c78f-aac6-5e1b-bbe3-425dde35dbfa
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e B06620
|f A2:AP05A0
|h Other scheme
|i book
|m 0314966
|