|
|
|
|
| LEADER |
01077nam a2200277 a 4500 |
| 001 |
c000121214 |
| 003 |
CARM |
| 005 |
20011002160826.0 |
| 008 |
730108s1972 enka n000 0 eng d |
| 015 |
|
|
|a B7301235
|
| 019 |
1 |
|
|a 3524193
|5 LACONCORD2021
|
| 020 |
|
|
|a 0115502769 :
|c L.0.32
|
| 035 |
|
|
|a (OCoLC)13012309
|5 LACONCORD2021
|
| 040 |
|
|
|a BNB
|b eng
|c BNB
|d NSL:M
|
| 050 |
0 |
0 |
|a HE363.G73
|
| 082 |
0 |
4 |
|a 388.1/1
|2 18
|
| 110 |
1 |
|
|a Great Britain.
|b Dept. of the Environment.
|
| 245 |
1 |
0 |
|a Getting the best roads for our money :
|b the COBA method of appraisal /
|c Department of the Environment.
|
| 260 |
|
|
|a London :
|b H.M.S.O.,
|c 1972.
|
| 300 |
|
|
|a [2], 17 p. :
|b ill. ;
|c 25cm.
|
| 500 |
|
|
|a Trunk roads. Planning. Cost-benefit analysis. COBA. Great Britain (BNB/PRECIS)
|
| 650 |
|
0 |
|a Roads
|z Great Britain.
|
| 650 |
|
0 |
|a Cost effectiveness.
|
| 852 |
8 |
|
|b CARM
|h A2:AL13F0
|i C05027
|p 0167850
|f BK
|
| 999 |
f |
f |
|i aa589014-3d2f-5502-b00f-a57f124882ba
|s 39a13e53-eb48-5765-a289-825e4579664e
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e C05027
|f A2:AL13F0
|h Other scheme
|i book
|m 0167850
|