|
|
|
|
| LEADER |
00832nam a22002291a 4500 |
| 001 |
c000056281 |
| 003 |
CARM |
| 005 |
00000000000000.0 |
| 008 |
851211s1961 nju 00010 eng d |
| 019 |
1 |
|
|a 4181398
|5 LACONCORD2021
|
| 035 |
|
|
|a (OCoLC)1705024
|5 LACONCORD2021
|
| 100 |
1 |
|
|a Tonge, Fred M.
|
| 245 |
1 |
2 |
|a A heuristic program for assembly line balancing /
|c Fred M. Tonge.
|
| 260 |
|
|
|a Englewood Cliffs, N.J. :
|b Prentice-Hall,
|c 1961.
|
| 300 |
|
|
|a xi, 115 p.
|
| 650 |
|
0 |
|a Assembly-line methods.
|
| 650 |
|
0 |
|a Heuristic programming.
|
| 650 |
|
0 |
|a Operations research.
|
| 852 |
8 |
|
|b CARM
|h A2:AD01C0
|i B00661
|p 0031041
|f BK
|
| 082 |
0 |
4 |
|a 658.54
|
| 999 |
f |
f |
|i dd131e25-1923-56c5-825d-044ff266d696
|s 54b79955-101f-5ea9-a00e-e85a2a10b88f
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e B00661
|f A2:AD01C0
|h Other scheme
|i book
|m 0031041
|