|
|
|
|
| LEADER |
01518nam a2200325 a 4500 |
| 001 |
c000045383 |
| 003 |
CARM |
| 005 |
20010509123652.0 |
| 008 |
791206s1979 at b b 000 0 eng d |
| 019 |
1 |
|
|a 1662816
|z 4125809
|z 53466354
|z 57325692
|z 57986905
|z 61015618
|5 LACONCORD2021
|
| 020 |
|
|
|a 0909733678 :
|c $5.00 Aust.
|
| 035 |
|
|
|a (OCoLC)27576640
|5 LACONCORD2021
|
| 040 |
|
|
|a ANB
|b eng
|c ANB
|d VSL
|
| 042 |
|
|
|a anuc
|
| 043 |
|
|
|a u-at-vi
|
| 082 |
0 |
4 |
|a 388.4131/4/0994/5/1
|
| 110 |
2 |
|
|a Australian Institute of Urban Studies.
|b Victorian Division.
|
| 245 |
1 |
0 |
|a Staggered work hours and peak hour congestion in Melbourne :
|b a report /
|c by the Victorian Division of the Australian Institute of Urban Studies.
|
| 260 |
|
|
|a Canberra :
|b Australian Institute of Urban Studies,
|c 1979.
|
| 300 |
|
|
|a 35p. :
|b graphs, map ;
|c 25cm.
|
| 440 |
|
0 |
|a AIUS publication ;
|v no.79
|
| 490 |
1 |
|
|a Research project ;
|v 60
|
| 500 |
|
|
|a Road traffic at peak times. Effects of flexible working hours. Melbourne (ANB/PRECIS SIN 0349615)
|
| 504 |
|
|
|a Includes bibliographical references.
|
| 650 |
|
0 |
|a Traffic flow
|z Victoria
|z Melbourne.
|
| 650 |
|
0 |
|a Hours of labor, Flexible
|z Victoria
|z Melbourne.
|
| 810 |
2 |
|
|a Australian Institute of Urban Studies.
|b Victorian Division.
|t Research project ;
|v 60.
|
| 852 |
8 |
|
|b CARM
|h A2:AE08F0
|i C00734
|p 0042921
|f BK
|
| 999 |
f |
f |
|i f7522328-b437-51be-8dca-48926ebd213e
|s bd09475d-b490-5dc3-afc1-337c88485e5f
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e C00734
|f A2:AE08F0
|h Other scheme
|i book
|m 0042921
|